Construction Pictures

Started May 2002

Back to the Idaho Property Page

Jump to the Construction Pictures2 Page

Previous page 3 of 3

Randy Prepping for the Slab Ready for the Heating Pipe in the Slab Another View of the Prep for the Slab Another view of the Slab Prep Sill Plate
Starting to Frame the Garage Installing a Sill Plate Framing the Garage Another View of the Garage Framing Pond Level Has Not Dropped Much
And Yet Another picture of the Pond Roof Trusses on Garage Roof Trusses on Garage Roof Sheathing A-1 Heating Installing Heat Lines in the Floor
A-1 Heating Installing Heat Lines in the Floor No Change in the Water Level Overview of Site Garage Sheathing Almost Compleat Inside the Garage
Looking Out of the Garage toward Robie Creek Rd Inside the Garage Heat Pipes Heat Pipes Head end of the Heat Pipes
Pouring the Slab Pouring the Slab Poured Slab